Vacuum lifting & industrial handlingVacuum lifting equipment
EN

Search Easytech

Try a material or application

Product specifications

WSR-800LA Wheeled Glass Installation Robot

WSR-800LA is an Easytech wheeled glass installation robot. Maximum rated load: 800 kg; Travel motor power: 4 kW; Pad configuration: 500 × 800 mm × 2; Arm extension / outreach: 650 + 500 mm; Tilting: 0–180°.

Easytech Premium

WSR-800LA at a glance

Load & conditions
Maximum rated load800 kg; working-position limits applyLoad limitationsVaries with outreach and posture; use the load chart. Maximum height is not the full-load height.
Lifting height
Maximum lifting height4600 mm
Reach & extension
Arm extension / outreach650 + 500 mm
Access dimensions
Minimum overall dimensions3235 × 880 × 1620 mm

Get price & lead time

MOQ: 1 unit · Reply within 24 hours · Lead time confirmed per configuration

[email protected]

Or request a written quote here
Download PDF

Includes WSR-800LA specifications, configuration notes and drawings.

ENGINEERING REFERENCE

Drawings & working envelopes

WSR-800LA - load envelope
WSR-800LA load envelope. Axes are in metres; curve labels are allowable loads in kg for the illustrated configuration. Maximum height and maximum load are not simultaneous ratings.
Open full-size drawing
WSR-800LA - dimensions
WSR-800LA dimensional arrangement, mm. Dimensions refer to the illustrated folded or working posture, not necessarily the minimum transport envelope.
Open full-size drawing

TECHNICAL DATA

Technical specifications

Technical specifications for WSR-800LA.

WSR-800LA · technical data
Maximum rated load800 kg
Maximum lifting height4600 mm
Travel drive24 V front-wheel motor
Travel motor power4 kW
Gradeability12%
Pad configuration500 × 800 mm × 2
Vacuum systemTwin pumps, dual circuits
AlarmAudible and visual alarm
Arm extension / outreach650 + 500 mm
Tilting0–180°
Rotation360° continuous rotation
Side shift±50 mm
Side turning90° to each side
BatteryDC12 V / 190 Ah × 2
Operating time6–8 h; actual duration depends on the duty cycle
Minimum overall dimensions3235 × 880 × 1620 mm
Equipment weight2190 kg
Load limitationsVaries with outreach and posture; use the load chart. Maximum height is not the full-load height.
Vertical fine adjustment±75 mm
Remote controlWireless remote control; main parameters visible on the controller
Powered positioning functionsTravel, lifting, extension, rotation, tilting, side shift, vertical shift and side turning

Access route and configuration-specific working position

The maximum load and maximum lifting height are separate limits. First check access and setup with the pane and attachment, then locate the required installation position on the matching load chart. Control type and powered versus manual positioning differ across the range.

Compare similar configurations

Selection point

WSR-800LA — Wheeled Glass Installation Robot

WSR-1000M — Wheeled Glass Installation Robot

WSR-800L — Wheeled Glass Installation Robot

Maximum rated load

800 kg

1000 kg

800 kg

Maximum lifting height

4600 mm

5000 mm

4600 mm

Minimum overall dimensions

3235 × 880 × 1620 mm

—

3100 × 880 × 1620 mm

Equipment weight

2190 kg

2977 kg

1925 kg

Pad configuration

500 × 800 mm × 2

Ø400 mm × 8

Ø400 mm × 6

Equipment and intended application

The mobile chassis carries the lifting arm and vacuum head. Travel positions the machine; arm movement provides reach and height; the head aligns the glass using the listed tilt, rotation and fine-positioning functions. Each movement has its own limit, and the load envelope changes with reach and posture.

Workpiece compatibility

Topic

Details

Access to the work area

Check machine transport dimensions against doorways, elevators, corridors and turning radii, and verify floor load limits for the combined weight of the robot and glass.

Placement geometry

Specify glass weight and size, final installation height, horizontal setback and any overhead obstruction. Maximum height and maximum load are separate values and must not be combined as a single operating point.

Ground and weather

Check surface strength, slope, obstacles and the support arrangement. Gradeability is a travel specification, not permission to lift on that slope. Outdoor work also requires suitable glass, weather and site conditions.

Power supply and configuration

Topic

Details

Chassis and battery

Check the specification table for travel drive, battery setup and compact transport dimensions; real-world battery runtime depends on lift frequency, load weight and travel distance.

Vacuum head

Pad arrangement and vacuum circuits apply to the stated head. A fork or winch option uses a different load path and requires its own attachment instructions.

Positioning controls

Side shift translates the head; side turning swivels it; rotation turns the pane in its plane. These functions must not be conflated when checking access around an opening.

Counterweights and supports

Use the specified counterweight and support arrangement. Removing weights to reduce transport mass changes the working configuration; it does not preserve the same lifting envelope.

Installation and commissioning

  • Survey access and placement before delivery: door and lift dimensions, floor loading, turns, unloading space and the installation setback.
  • Prepare a suitable charging point using the supplied charger input. Check battery condition and the planned duty cycle before a shift.
  • Inspect the fitted pads, vacuum hoses, hydraulic lines, tyres or tracks, counterweights, support devices and emergency stop. Check both circuits when a dual system is fitted.
  • Commission controls and travel without a load, then carry out the prescribed checks for the selected glass and working posture. The operator needs the machine-specific operating instructions and load envelope.

Handling sequence

  1. Prepare the work area and set the machine to its approved lifting configuration. Keep the pickup and destination accessible for a safe set-down.
  2. Position the head on intact glass contact areas, apply vacuum and check the circuit indications before taking the glass weight.
  3. Use the load diagram for the selected reach and height. Make controlled travel and positioning movements; use fine adjustment to align the glass without forcing it against the opening.
  4. Transfer the pane onto its supports and secure it by the installation procedure before releasing the vacuum. Return the machine to its transport posture before relocating it.

Inspection, maintenance and replacement parts

Topic

Details

Before use

Inspect pads, hoses, vacuum indications, controls, tyres/tracks and the support arrangement. Investigate any alarm or change in movement.

Hydraulic system

Check for leaks and damaged hoses without touching pressurised leaks. Support moving parts and isolate energy before maintenance.

Battery and charging

Keep terminals and charging leads in serviceable condition and follow the fitted battery/charger instructions. Report declining runtime instead of assuming the catalog duration still applies.

Service identification

Record the model and serial number, attachment type, battery specification and affected component. Pad, hydraulic-seal and controller replacements must match the actual installed version.

Troubleshooting priorities

Topic

Details

Arm movement is inhibited

Check overload indication, emergency stop, power and the permitted posture. Do not bypass an interlock to reach the target position.

One vacuum circuit warns

Set the pane down using the prescribed safe procedure and find the cause. A second circuit does not authorise normal operation with a known fault.

Travel or positioning becomes irregular

Stop in a supported state and inspect the route, charge level, controls and hydraulic system. Resume only after the cause is resolved.

Frequently asked questions

What load should I use when selecting WSR-800LA?

WSR-800LA lists a maximum rated load of 800 kg. The permissible load at the required height and outreach comes from the matching configuration load chart. Maximum height is not the full-load height.

Can it lift its maximum rated load to maximum height?

Only if the model load chart explicitly permits that combination. Select the curve for the actual load and check the complete reach/height path, not just the final point.

What is the difference between side shift and rotation?

Side shift moves the pane laterally without changing its angle; rotation turns it within its plane. Side turning changes the head direction relative to the arm.

Can a narrow machine automatically use a passenger lift?

No. Check the whole transport envelope, turning space, total transported mass and lift loading restrictions. The narrowest chassis width is only one of those checks.

KEEP THE DETAILS

Product documentation

Equipment in use

Content updated

GET A QUOTE

Need a price or model recommendation?

Send your workpiece weight, size, or a photo — Jenny replies within 24 hours.

MOQ: 1 unit · Reply within 24 hours

WhatsApp
WhatsApp