Vacuum lifting & industrial handlingVacuum lifting equipment
EN

Search Easytech

Try a material or application

Easytech

Equipment Inspection & Technical Documentation

Understand Easytech equipment acceptance, model-specific documents, the 2026 ATS vacuum-system certificate and dated company assessment records.

Define what is being accepted

Before an order is released, agree the model, configuration, stated load conditions, movements, utilities, supplied accessories and the checks required for acceptance. A general company assessment, a product certificate and a test of the supplied machine answer different questions.

  • Configuration: match the quotation, technical drawings and order specification to the equipment being supplied.
  • Functional checks: identify the movements, controls and vacuum-system behavior to be demonstrated for the agreed configuration.
  • Workpiece or load trials: record the surface, dimensions, weight, orientation and test conditions when a trial forms part of the order.
  • Handover: identify the inspection record, demonstration video, manuals and other documents to accompany the shipment.
A component dimension check during equipment preparation. This photograph illustrates a workshop activity; it does not certify the completed lifting system.
A component dimension check during equipment preparation. This photograph illustrates a workshop activity; it does not certify the completed lifting system.

Available vacuum-system compliance record

The available ATS Certificate of Compliance is ATS202605198880201C-01C, dated 27 May 2026, for listed Vacuum System Equipment. It names Dongguan Easytech Automation Mechanical and Electrical Equipment Co., Ltd. and references report ATS202605198880201R-01R.

Unaltered cover page of ATS202605198880201C-01C. The certificate has additional model-list pages; this cover alone is not the complete conformity documentation.
Unaltered cover page of ATS202605198880201C-01C. The certificate has additional model-list pages; this cover alone is not the complete conformity documentation.

The stated assessment references EN 60204-1:2018/A1:2025 and EN ISO 12100:2010. The accompanying report identifies an ETJSV200-100 submitted sample. The certificate is a voluntary attestation and refers to the technical construction file. It must not be read as blanket certification of every item on this website, proof of a lifting capacity, or a substitute for the applicable declaration and instructions.

When documentation is required for procurement or import, send the exact model, configuration, destination and required standard. Ask for the matching model-list pages and applicable declaration, report or technical documents as part of the quotation review. Do not apply a mains-powered sample assessment automatically to another power system.

Company assessments: issuer, date and purpose

  • Bureau Veritas: company assessment MIC-ASR232995, audit dated 4 August 2023. A historical company assessment record.
  • SGS: Trade Assessment 473772270_T, report dated 13 June 2025; stated validity 14 June 2025–13 June 2026. This period has expired. A historical supplier assessment, not a current product certificate.

For verification of the SGS record, use the report number and company name with the SGS audited-supplier verification service. Ask Easytech for a dated company-document pack if your purchasing process requires the underlying record. Current contact details are shown on our contact page.

SGS audited-supplier verification

What to request for your equipment

  • Model-specific specifications and the selected configuration.
  • Dimensions, working envelope and load conditions needed for installation and selection.
  • Applicable operating instructions, maintenance information and parts identification.
  • The inspection or acceptance evidence agreed in the order.
  • Applicable compliance documentation for the exact equipment and destination.

A website specification PDF is a selection document. It is not an operating manual, a site lifting plan or proof that every optional configuration has the same certification scope.

Ordering and shipment documentation

Discuss a documentation requirement

LET’S DEFINE YOUR APPLICATION

The right equipment starts
with your workpiece.

Tell us what you lift, where it moves and how it needs to arrive.

Discuss your project