Vacuum lifting & industrial handlingVacuum lifting equipment
EN

Search Easytech

Try a material or application

Product specifications

ET-GR-LEG-600 Glass Installation Robot

ET-GR-LEG-600 is an Easytech glass installation robot. Maximum load with arm retracted: 600 kg; Maximum load at full extension: 400 kg; Maximum lifting height at pad frame center: 3200 mm; Telescopic stroke: 600 mm; Maximum horizontal distance from front wheel edge to pads: 1310 mm.

Easytech Premium

ET-GR-LEG-600 at a glance

Load & conditions
Headline load600 kg; see conditionsMaximum load with arm retracted600 kgMaximum load at full extension400 kg
Lifting height
Maximum lifting height at pad frame center3200 mm
Reach & extension
Maximum horizontal distance from front wheel edge to pads1310 mmTelescopic stroke600 mm

Maximum load and maximum height are not simultaneous—refer to the load chart for each arm reach and working position.

Get price & lead time

MOQ: 1 unit · Reply within 24 hours · Lead time confirmed per configuration

[email protected]

Or request a written quote here
Download PDF

Includes ET-GR-LEG-600 specifications, configuration notes and drawings.

TECHNICAL DATA

Technical specifications

Technical specifications for ET-GR-LEG-600.

ET-GR-LEG-600 · technical data
Maximum load with arm retracted600 kg
Maximum load at full extension400 kg
Maximum lifting height at pad frame center3200 mm
Telescopic stroke600 mm
Maximum horizontal distance from front wheel edge to pads1310 mm
TiltingApproximately 135°, hydraulic
RotationHydraulic continuous rotation
Side shift75 mm to each side, 150 mm total
Side turningManual 180°, 90° to each side, spring locking
Weight including counterweights1350 kg
Weight excluding counterweights1030 kg
Operating power supplyDC 24 V
Drive power2.2 kW
Hydraulic power unit power0.8 kW
Battery12 V / 100 Ah × 2
Stated maximum operating timeApproximately 20 h; actual duration depends on the duty cycle
Charging input110–220 V
Charging timeApproximately 5 h
Vacuum systemTwin pumps, dual circuits
Number of pads6 pcs
Pad diameter300 mm
Vacuum pump modelCV-35,DC24V
Maximum flow per pump35 L/min
Maximum vacuum gauge pressure-85 kPa
Vacuum pump start / stop thresholds−60 / −70 kPa
Vacuum alarmAudible and visual alarm below the stated 60% vacuum level; this percentage is not a load percentage
Overload protectionExtension and lifting are restricted after overload detection
Vacuum retentionIndependent air reservoir and non-return valve
Pad frame dimensions1800 × 800 mm
Wheel specifications400 × 180 mm
Pad materialAluminum body and NBR

Wheeled installation geometry

Lifting capacity decreases as the boom extends—check both retracted and extended load-chart limits alongside glass placement height, doorway clearance and counterweight setup.

Compare similar configurations

Selection point

ET-GR-LEG-600 — Glass Installation Robot

ET-GR-LEG-800S — Wheeled Glass Lifting Robot

Maximum load with arm retracted

600 kg

800 kg

Maximum load at full extension

400 kg

500 kg

Maximum lifting height at pad frame center

3200 mm

3800 mm

Maximum horizontal distance from front wheel edge to pads

1310 mm

1630 mm

Weight including counterweights

1350 kg

1250 kg

Equipment and intended application

The mobile chassis carries the lifting arm and vacuum head. Travel positions the machine; arm movement provides reach and height; the head aligns the glass using the listed tilt, rotation and fine-positioning functions. Each movement has its own limit, and the load envelope changes with reach and posture.

Load and arm position

Rated up to 600 kg with the arm retracted and 400 kg at full extension—check both pickup and final placement positions on the load chart.

Workpiece compatibility

Topic

Details

Access to the work area

Check machine transport dimensions against doorways, elevators, corridors and turning radii, and verify floor load limits for the combined weight of the robot and glass.

Placement geometry

Specify glass weight and size, final installation height, horizontal setback and any overhead obstruction. Maximum height and maximum load are separate values and must not be combined as a single operating point.

Ground and weather

Check surface strength, slope, obstacles and the support arrangement. Gradeability is a travel specification, not permission to lift on that slope. Outdoor work also requires suitable glass, weather and site conditions.

Power supply and configuration

Topic

Details

Chassis and battery

Check the specification table for travel drive, battery setup and compact transport dimensions; real-world battery runtime depends on lift frequency, load weight and travel distance.

Vacuum head

Pad arrangement and vacuum circuits apply to the stated head. A fork or winch option uses a different load path and requires its own attachment instructions.

Positioning controls

Side shift translates the head; side turning swivels it; rotation turns the pane in its plane. These functions must not be conflated when checking access around an opening.

Counterweights and supports

Use the specified counterweight and support arrangement. Removing weights to reduce transport mass changes the working configuration; it does not preserve the same lifting envelope.

Installation and commissioning

  • Survey access and placement before delivery: door and lift dimensions, floor loading, turns, unloading space and the installation setback.
  • Prepare a suitable charging point using the supplied charger input. Check battery condition and the planned duty cycle before a shift.
  • Inspect the fitted pads, vacuum hoses, hydraulic lines, tyres or tracks, counterweights, support devices and emergency stop. Check both circuits when a dual system is fitted.
  • Commission controls and travel without a load, then carry out the prescribed checks for the selected glass and working posture. The operator needs the machine-specific operating instructions and load envelope.

Handling sequence

  1. Prepare the work area and set the machine to its approved lifting configuration. Keep the pickup and destination accessible for a safe set-down.
  2. Position the head on intact glass contact areas, apply vacuum and check the circuit indications before taking the glass weight.
  3. Use the load diagram for the selected reach and height. Make controlled travel and positioning movements; use fine adjustment to align the glass without forcing it against the opening.
  4. Transfer the pane onto its supports and secure it by the installation procedure before releasing the vacuum. Return the machine to its transport posture before relocating it.

Inspection, maintenance and replacement parts

Topic

Details

Before use

Inspect pads, hoses, vacuum indications, controls, tyres/tracks and the support arrangement. Investigate any alarm or change in movement.

Hydraulic system

Check for leaks and damaged hoses without touching pressurised leaks. Support moving parts and isolate energy before maintenance.

Battery and charging

Keep terminals and charging leads in serviceable condition and follow the fitted battery/charger instructions. Report declining runtime instead of assuming the catalog duration still applies.

Service identification

Record the model and serial number, attachment type, battery specification and affected component. Pad, hydraulic-seal and controller replacements must match the actual installed version.

Troubleshooting priorities

Topic

Details

Arm movement is inhibited

Check overload indication, emergency stop, power and the permitted posture. Do not bypass an interlock to reach the target position.

One vacuum circuit warns

Set the pane down using the prescribed safe procedure and find the cause. A second circuit does not authorise normal operation with a known fault.

Travel or positioning becomes irregular

Stop in a supported state and inspect the route, charge level, controls and hydraulic system. Resume only after the cause is resolved.

Frequently asked questions

How should I interpret the load figures for ET-GR-LEG-600?

Rated up to 600 kg with the arm retracted and 400 kg at full extension—check both pickup and final placement positions on the load chart.

Can it lift its maximum rated load to maximum height?

Only if the model load chart explicitly permits that combination. Select the curve for the actual load and check the complete reach/height path, not just the final point.

What is the difference between side shift and rotation?

Side shift moves the pane laterally without changing its angle; rotation turns it within its plane. Side turning changes the head direction relative to the arm.

Can a narrow machine automatically use a passenger lift?

No. Check the whole transport envelope, turning space, total transported mass and lift loading restrictions. The narrowest chassis width is only one of those checks.

KEEP THE DETAILS

Product documentation

Content updated

GET A QUOTE

Need a price or model recommendation?

Send your workpiece weight, size, or a photo — Jenny replies within 24 hours.

MOQ: 1 unit · Reply within 24 hours

WhatsApp
WhatsApp