Vacuum lifting & industrial handlingVacuum lifting equipment
EN

Search Easytech

Try a material or application

Easytech

Gantry Crane Systems

Review gantry crane span, clear height, hoist and support conditions together. Define the complete suspended load and your installation arrangement.

Gantry systems span a working area between supporting legs. Select the clear span, working height and support arrangement against the load path and site constraints.

Define the configuration

Selection item

What to provide

Working span

Required clear width and positions of the legs relative to the equipment/workpiece.

Height

Usable hook position after allowing for the beam, trolley, hoist and lifting tool.

Load

Workpiece plus the applicable suspended equipment.

Mobility

Whether relocation or movement is actually specified, and under which conditions.

Check the installation boundary

A gantry is not automatically mobile under load. Wheel presence or a product-family name is insufficient evidence; use the permitted movement in the exact equipment instructions.

Move from a layout to equipment

Prepare a workstation drawing and the required load/movement information. Review the actual model specifications and identify included hoist, controls and attachments before requesting the final installation and quotation scope.

Browse documented crane configurations · Compare crane formats · Installation planning · Complete cost scope

Further questions for your purchasing review

What affects the total cost of a gantry lifting station?

Capacity, span, height, slewing or travel, lifting equipment, structural work and installation affect the total cost.

Draw the usable gantry working area

The useful opening is the clear space between the legs with the hoist, trolley and load in position. Overall frame width is not usable travel.

Layout item

What to mark

Clear span

Mark the pickup and placement points between the legs.

Under-beam clearance

Include hoist/trolley depth, hook, gripper and workpiece.

Relocation

State whether the empty structure must move and the route; loaded travel needs explicit equipment approval.

Site interfaces

Check floor/support, doors, services and interference at each intended location.

Documented equipment route

ET-CR-GANTRY — Gantry Crane System

Configure this structure for the proposed workstation layout, complete load and supporting conditions. Specify the required capacity, span or reach, height and mounting arrangement together with the lifting device and end tool.

Close the quotation interfaces

Responsibility

Agree in the proposal

Structural design

Selected arrangement, loads/reactions and support/foundation requirements.

Lifting equipment

Device, trolley/connection, tool and full suspended mass.

Utilities

Electrical/air arrangement and moving supply path.

Site work

Installation, access, commissioning and required records.

Check all pickup and placement positions with the proposed arrangement before acceptance. Do not use another crane’s foundation, anchor dimensions or load chart for this installation.

LET’S DEFINE YOUR APPLICATION

The right equipment starts
with your workpiece.

Tell us what you lift, where it moves and how it needs to arrive.

Discuss your project