Vacuum lifting & industrial handlingVacuum lifting equipment
EN

Search Easytech

Try a material or application

Product specifications

ET-TL-MOB-060 Manually Repositioned Mobile Vacuum Tube Lifter

ET-TL-MOB-060 is a 60 kg mobile vacuum tube lifting station with manual or forklift repositioning and a 3000 mm jib. The control handle lets the operator guide repeated bag or carton transfers; suitability depends on the selected suction head and packaging surface.

Easytech Standard & Custom

ET-TL-MOB-060 at a glance

Load & conditions
Rated load60 kg
Installation
MountingMobile base / forklift

Lifting capacity depends on the surface seal and selected suction head.

Get price & lead time

MOQ: 1 unit · Reply within 24 hours · Lead time confirmed per configuration

[email protected]

Or request a written quote here
Download PDF

Includes ET-TL-MOB-060 specifications, configuration notes and drawings.

TECHNICAL DATA

Technical specifications

Technical specifications for ET-TL-MOB-060.

ET-TL-MOB-060 · technical data
Rated load60 kg
Jib length3000 mm
Jib rotation250 °
Cable reel length10 m
Repositioning methodManual / forklift repositioning; lock the jib before repositioning
BaseSteel counterweight base; height-adjustable feet

Model configuration and selection

The jib rotates through 250° and the unit has a 10 m cable reel, a steel counterweight base and height-adjustable support feet. Adjustable feet level the working base; they do not define a telescopic lifting column. Lock the jib before relocation. Compare ET-TL-TEL-060 when column-height adjustment is required. Prepare the minimum doorway height, floor route, pickup and placement heights and actual package sample when specifying the station.

Compare model configurations

Selection point

ET-TL-BAT-060

ET-TL-TEL-060

ET-TL-MOB-060

Rated load

60 kg

60 kg

60 kg

Folded clearance height

2100 mm

—

—

Jib rotation

250 °

—

250 °

Power supply

Mains / battery dual power options

—

—

Travel

Battery-powered

—

—

Column

—

Telescopic lifting

—

Repositioning method

—

Forklift repositioning; lock the jib first

Manual / forklift repositioning; lock the jib before repositioning

Jib length

—

—

3000 mm

Equipment and intended application

The same vacuum system grips the load and changes the length of the lifting tube. The operator meters air through the control handle to raise, hold or lower the workpiece. A jib or overhead rail carries the suspended tube assembly; the vacuum generator supplies airflow through a separate hose and filter.

Workpiece compatibility

Topic

Details

Bags and sacks

Position the bag head on an intact area away from seams, folds and loose valves. Test the filled bag rather than an empty packaging sample: porosity, fill movement and the outer layer affect the grip.

Cartons and containers

The complete pad sealing area must sit on a sound panel. Check lid strength, tape seams and any internal bag; lifting the outer carton must lift the contents without separating the packaging.

Panels and longer workpieces

Distribute the pads across the load to control bending and overhang. Changing to a larger head adds suspended mass and requires a new assessment of tube and suspension capacity.

Power supply and configuration

Topic

Details

Lifting assembly

Tube, top swivel, control unit and workpiece-matched suction head form the suspended assembly. The table specifies the model rating and tube dimensions where available.

Handle selection

Type A is a single-hand arrangement; Type B uses a rocker control; Types C and E provide extended two-hand control. Handle reach, operator position and release access must suit both the lowest pickup and highest placement.

Supporting system

Column jib, wall jib or overhead rail is selected for the work area. Include the vacuum generator, hose routing, filter, electrical connection and support structure in the system layout.

Optional accessories

Quick-change suction heads, blower mounting brackets and sound enclosures can be added as options; always size the complete system to the lowest-rated component (lifting tube, head and handle).

Installation and commissioning

  • Map the lowest pickup, highest placement and horizontal travel. The tube length, usable lifting stroke and available ceiling height are different dimensions; allow space for the trolley, swivel, handle and workpiece.
  • Provide a suitable support structure and electrical supply for the selected generator. Keep the generator inlet, cooling path and exhaust unobstructed, and route the vacuum hose without tight bends or snagging points.
  • At commissioning, check generator airflow direction, hose connections and filter installation. A trained technician sets the unloaded suspension position and then checks the loaded response with the actual workpiece.
  • Mobile versions require the base, support feet and arm locks to be used in the specified operating and transport positions. A forklift used to relocate a unit does not make it permissible to travel with a suspended load.

Handling sequence

  1. Inspect the lifting tube, supply hose, head seal, connection and support system. Establish that the selected head and packaging match the load.
  2. Bring the head squarely onto the contact surface and apply suction using the fitted handle. Verify an even grip before raising the load.
  3. Raise only enough to clear the pickup, keep control of the handle and guide the load through the planned travel path. Do not drag a load sideways with the tube.
  4. Lower until the destination fully supports the load, then operate the release. Keep the release control distinct from the control used to lower the load.

Inspection, maintenance and replacement parts

Topic

Details

Before use

Check the head seal, tube folds, hose clamps and quick connector. Stop if the tube is cut, a connection is loose or the control response changes.

Air path

Check the dust filter according to actual dust loading. Isolate the generator before opening the filter; do not operate without its element. Use the cleaning method specified for that element.

Replacement selection

Identify the tube diameter and length, end connections, head seal profile and filter type. A hose of similar appearance is not automatically a lifting tube.

After maintenance

Recheck leakage and control response unloaded, then perform the prescribed functional checks before returning to production.

Troubleshooting priorities

Topic

Details

Will not lift the intended load

Check pad sealing, packaging porosity, dust filter cleanliness and hose joints—porous sacks require adequate airflow as well as vacuum level.

Unloaded head rises or drops unexpectedly

Stop and have the suspension adjustment and control unit checked. Do not compensate by closing an adjustment valve fully.

Grip deteriorates during lowering

Support the load and stop use. Have the head, air path and loaded control adjustment checked before restarting.

Frequently asked questions

What load should I use when selecting ET-TL-MOB-060?

ET-TL-MOB-060 is rated for 60 kg in its standard configuration. Actual working capacity depends on workpiece size, surface, orientation and any attached tooling; on boom or telescopic models, check the load chart for your exact reach and height.

When are separate surface load ratings used?

Porous or loose surfaces allow more leakage than sealed surfaces. If the table lists separate ratings, use the rating for the actual packaging and test a representative load. A sealed-surface figure does not apply automatically to sacks.

Does the tube length equal the lift height?

No. Tube length describes the lifting element, while stroke is its usable movement. Installation height also includes the support trolley, top swivel, control head and workpiece.

Can one system handle both bags and boxes?

It can be configured with suitable heads, but a head change also changes contact geometry and suspended weight. Each head-and-workpiece combination needs its own grip and operating check.

KEEP THE DETAILS

Product documentation

CUSTOMER EXPERIENCES

In our customers’ words

Read customer feedback

Content updated

GET A QUOTE

Need a price or model recommendation?

Send your workpiece weight, size, or a photo — Jenny replies within 24 hours.

MOQ: 1 unit · Reply within 24 hours

WhatsApp
WhatsApp