- Load & conditions
- Surface loadSealed 65 kg; porous 60 kg
- Lifting stroke
- Lifting stroke1700 / 2500 mm
- Installation
- MountingJib crane / rail
- Vacuum supply
- Pump / blower power3000 WElectrical supply standard480 / 380 / 220 V; 3 PH, selected per order
Easytech
A shared station for bags and cartons
Plan a shared bag and carton handling station. Review packaging surfaces, suction-head changes, lift heights and the work cycle using an illustrative layout.
- Load & conditions
- Surface loadSealed 50 kg; porous 45 kg
- Lifting stroke
- Lifting stroke1700 / 2500 mm
- Installation
- MountingJib crane / rail
- Vacuum supply
- Pump / blower power3000 WElectrical supply standard480 / 380 / 220 V; 3 PH, selected per order
- Load & conditions
- Surface loadSealed 40 kg; porous 35 kg
- Lifting stroke
- Lifting stroke1700 / 2500 mm
- Installation
- MountingJib crane / rail
- Vacuum supply
- Pump / blower power2200 WElectrical supply standard480 / 380 / 220 V; 3 PH, selected per order
- Application & limits
- Maximum compatible bag load45 kg
- Function
- Rotation360 °Tilting90 °

Plan a shared bag and carton station
Use this planning example to define the handling stages and requirements for your own workstation.
Stage | Decision and deliverable |
|---|---|
Package set | List filled bag/carton formats, weights, surfaces, seams and closures. |
Head selection | Test the approved head/source combination for each format; identify any head change. |
Working envelope | Check the bottom of the pallet, deepest row, highest stack and operator reach. |
Support and utilities | Define jib/rail coverage, vacuum-source location, hose path and utility connection. |
Acceptance | Record the approved package/head combinations and the full transfer cycle for each. |

Prepare the project review
Send a layout, representative workpiece details and the required movements. Identify existing equipment that must be retained, available utilities and the destination. The final proposal must name the selected configuration, interfaces, operating conditions and agreed acceptance scope.
Tube-lifter buying guide · Bag handling · Carton handling
Choose from the package condition, not only its weight
Model / configuration | Load on sealed surfaces | Load on loose / porous surfaces | Lifting stroke |
|---|---|---|---|
65 kg | 60 kg | 1700 / 2500 mm | |
50 kg | 45 kg | 1700 / 2500 mm | |
40 kg | 35 kg | 1700 / 2500 mm |
Example for requirement planning: a 50 kg filled permeable sack needs a configuration assessed for that leakage condition. A 50 kg sealed-surface rating alone is insufficient. A carton of the same mass can need a different head footprint and packaging-strength review.
Keep an approved package/head matrix
Package record | Define before acceptance |
|---|---|
Bag variant | Filled dimensions, material, seams, closure and approved contact area. |
Carton variant | Loaded dimensions, board/closure condition and permitted pickup face. |
Selected head | Identification, connection, changeover and the applicable conditions. |
Pallet extremes | Bottom/near/far pickup and highest placement within the working envelope. |
Complete cycle | Grip, lift, transfer, placement, release and any head change. |
List all bag and carton sizes, weights and surface types you plan to run so we can select suction heads that handle every package reliably.
Type A — Single-Hand Control Handle — Type A has a 45 kg maximum compatible bag-load condition; include the handle when checking the complete station.
Content updated
GET A QUOTE
Need a price or model recommendation?
Send your workpiece weight, size, or a photo — Jenny replies within 24 hours.
MOQ: 1 unit · Reply within 24 hours
