# Will a Glass Lifting Robot Fit Your Site?

Plan the route from unloading to glazing. Check door openings, corners, the floor and freight elevator, and the room to place the pane. Includes a printable site measurement sheet.

Original page: https://www.auto-easy.com/glazing-robot-site-access/
Topic: Installation & Commissioning
Last updated: 2026-11-19

## At a glance

When we look at a doorway on a customer’s plan, we ask what happens just beyond it. The robot may have room to go straight through, while a corner of the glass still needs space to swing past the next wall.

- Doors and overhead clearance. Measure the opening as it will be used. Include thresholds, door hardware and anything that hangs into the route.

- The turn with the glass. Draw the robot and the pane at the corner. An outer glass edge and the rear of the machine take different paths.

- Floors and freight elevators. Add the weights of everything that travels together. Check the total weight and the load where wheels or stabilizers touch down.

- The last few inches. Mark where the pane goes, where the robot can stand, and where the suction head will back out after release.

![In this WSR‑800LA job, the glazing team works from inside the building to position a large pane at the opening.](<https://www.auto-easy.com/api/media/file/wsr-800la-indoor-288b92e7e4-content-display-6c8f37bfb08474f1.webp>)

In this WSR‑800LA job, the glazing team works from inside the building to position a large pane at the opening.

## Start where the glass comes off the truck

On your plan, mark where the glass is unloaded, where it meets the robot, and where it will be installed. Those points tell us which parts of the route need to fit the machine by itself, which must fit a rack or trolley, and where the robot needs space to work with the pane attached.

A ground floor storefront and an upper floor partition can use the same kind of equipment but have very different routes. In one, the glass can be staged near the opening. In the other, it may go up in a freight elevator on a rack and meet the robot on the installation floor. We start by identifying the trips your team actually needs to make.

- Robot on its own. Use its outline in the specified travel position, with the head, wheels and counterweights that will be fitted for the move.

- Pane on a rack. Include the glass overhang, the rack, and any trolley carrying it. Mark the spot where the robot can approach the glass.

- Robot with the pane. Use the complete outline in the permitted carrying position. Mark where the pane must turn, where it has to stop and where it is set down.

Send the sizes and weights of both your heaviest pane and your longest one if they are different. The heaviest pane may determine how much lifting capacity you need. A lighter pane with a longer edge may be the hardest one to get around the corner.

## Measure the clear opening

Use the clear width between the nearest obstructions with the door held as it will be during the move. A door leaf, closer or handle can take up space inside the frame. Measure the clear height from the floor surface at the opening to the lowest fitting the machine or pane must pass beneath. Use the finished floor level and mark any ramp, threshold or temporary covering that changes the approach.

For a straight doorway we put the plan and the machine drawing side by side. We compare the clear width with the widest part of the machine in the travel position, and the clear height with its highest point. For a trip with glass aboard, use the outline that includes the pane. If a ramp changes the angle of entry, show that in a side view so the top edge can be checked along the approach.

### Three widths on one drawing

Here’s what that looks like on the [WSR‑800LA](<https://www.auto-easy.com/glass-lifting-robot-wsr-800la/>).

![Widths from the WSR‑800LA front drawing. The sketch isolates the three dimensions used here.](<https://www.auto-easy.com/api/media/file/easytech-glass-robot-wsr-800la-front-widths-content-display-eefaa2327dbffb37.webp>)

Widths from the WSR‑800LA front drawing. The sketch isolates the three dimensions used here.

|  / Width /  |  / Where it is measured /  |
| --- | --- |
|  / 880 mm /  |  / Chassis width /  |
|  / 2,075 mm /  |  / Across the vacuum head shown /  |
|  / 2,468 mm /  |  / Across the stabilizers in the position shown /  |

The last number tells us how much width the robot needs with its stabilizers out in that position. At the door, measure against the full outline of the robot and its head as they will travel.

We also look at where the opening sits. A doorway at the end of a straight corridor leaves room to line up. The same doorway just after a right angle turn may require the robot, its head and the longest pane to clear part of the turn before any of them reach the frame.

## Draw the corner as well as the doorway

The easiest way to discuss a tight turn is a view from above. Draw both corridors, the inside corner and the outer wall. Add anything fixed in the way, such as a column, a handrail or a cabinet. Then show the outlines of the robot and the longest pane as they approach, pass the corner and line up with the next opening.

![The blue outlines fit in the straight sections. Partway through the turn, the orange pane crosses the wall line.](<https://www.auto-easy.com/api/media/file/easytech-glass-robot-turning-space-content-display-45c31a1afe163ee8.webp>)

The blue outlines fit in the straight sections. Partway through the turn, the orange pane crosses the wall line.

[Open the full-size turning diagram](<https://www.auto-easy.com/api/media/file/easytech-glass-robot-turning-space.webp>)

A clear position at the start and another at the end leave the turn itself to check. On a long pane, an end can pass closer to a wall partway through the steering movement than it does when the robot is lined up. Fitting the turn also means keeping sight of those edges and giving the operator a useful place to stand.

Use a measured plan to work through that path with the steering and travel positions of the selected setup. A drawing from above helps spot a conflict early. Where the head or pane changes angle or the floor changes level, add a view from the side. If the route pinches at one point, we can compare a shorter setup, a different staging position, or separate planned moves for the robot and the glass.

## Check what the floor and elevator will carry

Get the weight for the machine as it will travel, including the fitted head and any counterweights. On the [WSR‑800LA specification](<https://www.auto-easy.com/glass-lifting-robot-wsr-800la/#specifications>), the equipment weight is 2,190 kg. Start with the weight for your supplied arrangement and add the pane, rack or trolley only if they travel on the same platform at the same time. Include any people permitted to ride by the elevator’s operating rules.

There are two different checks. Total weight matters for the elevator’s rated capacity. The floor also has to take the load at the points where wheels or stabilizers touch it. A suspended slab, raised floor, service cover or lift threshold can have a different local limit from the surrounding floor.

Give the site team the load and where it lands. Use the wheel or support loading for the actual configuration. Load distribution changes with the machine’s position and the way the load is supported.

For a freight elevator, record the door opening, cabin width and depth, and the approach space on both floors. Look at how the robot or rack gets across the sill and can turn after leaving. For ramps and changes of level, bring the profile of the approach into the layout and use the equipment’s travel instructions for that load and posture.

Structural support and the lifting plan belong with the people responsible for the site. Give them the measured route, machine setup, load and planned positions so they can assess the lift together. [HSE guidance on planning lifting operations](<https://www.hse.gov.uk/work-equipment-machinery/planning-organising-lifting-operations.htm>).

## Work backward from the glass in the frame

Look again at the [indoor installation photo](<https://www.auto-easy.com/wsr-800la-indoor-glass/>). The robot has to hold the glass near its final position while the team lines up the edges with the frame. To choose the equipment, we want to see where those edges must finish and how the head will reach them from a place the robot can stand.

Sketch the installation in front view and side view. Mark the landing support or sill, the face the suction pads contact, the pane’s final orientation, and the distance to the planned machine position. Use the same floor level for the heights. A plinth, curb or glazing pocket can keep the machine back from the opening even when the floor near it looks clear.

- Find the placement position on the load chart. Use the load chart for the selected head and machine setup. Follow its reference points for height and reach. Check the pane weight through the required movement, including the farthest position used to place it.

- Leave room for the pane to move. Draw a tilt or turn if the glass arrives in a different orientation from the one it needs in the frame. Include the top and bottom edges, the head and any support legs that must be set out.

- Give the head a way out. Once the pane is on its supports and secured by the installation procedure, the head needs space to pull away. Include room to withdraw past a sill, frame lip or nearby pane.

When a model lists a maximum load and a maximum lifting height, read the load chart at the height and reach you actually need. The combination for your pane is what makes the model useful on site. [Read the load chart guide](<https://www.auto-easy.com/glass-robot-load-chart-guide/>).

## Let the tightest part of the job guide the choice

A compact robot such as the [WSR‑400MINI](<https://www.auto-easy.com/glass-lifting-robot-wsr-400mini/>) is a sensible model to look at when access is tight. Compare its working reach and load chart as soon as you have the pane sizes. The smaller chassis helps at an opening, while reach at the frame and the glass’s path through the turn are still part of the same choice.

![Even with a compact machine, the pane extends well beyond the wheels. Allow for both outlines where the route turns.](<https://www.auto-easy.com/api/media/file/robot-400-clean-b98317e392-content-display-b60f56a942b8fadc.webp>)

Even with a compact machine, the pane extends well beyond the wheels. Allow for both outlines where the route turns.

When the installation needs a larger working reach or a different head, compare the [WSR‑800LA](<https://www.auto-easy.com/glass-lifting-robot-wsr-800la/>) using the available space around the final position. Set the unloading and pickup points on the drawing early. Bringing the pane to a nearby staging position can give the robot a shorter working route.

Some sites already have suitable overhead lifting equipment and a clear suspended path to the opening. In those cases, we also compare a crane-suspended vacuum lifter. It changes what needs to travel on the floor and puts a different load on the lifting support. [Compare a mobile robot with an overhead lifter](<https://www.auto-easy.com/glass-robot-vs-vacuum-lifter/>).

## Take one route sketch and a few measurements

Print this sheet and mark the place you think will be tightest. A photograph from each side of that point and a side view of the installation position help us see the job alongside your measurements.

[Download the site measurement sheet (one-page PDF)](<https://www.auto-easy.com/api/document-files/file/Easytech-Glass-Robot-Site-Measurement-EN.pdf>)

### Show us where the glass has to go

Send the pane sizes and weights, a route sketch, and a photo of the tightest point. We can talk through which equipment suits the route and the final placement.

[Discuss your glass installation](<https://www.auto-easy.com/request-quote/>)